Welcome to our Re-construction phase. Keep checking back for updates as we finish up the remodel of our Facilities Planning (Architectural/ Engineering) division... And as we continue with the remodel of the CS (Computer Services), and GS (Graphic Services) areas.

We had a group of guys here that call themselves Steppin' Out Ministries, who took care of the main indoor renovations, and will be intermittently back to help rebuild and tear down as needed/ or funds allow. On the outside, we had High Touch Ministries doing the initial dirt work and grading. This team consists of, well, Darren... and his bionic mechanical, appendage extensions.

Please forgive the lack of "before" shots, hopefully I'll be able to find some later on, and hopefully things will begin to make sense as the days and hours progress.

Note: If you are unfamiliar w/ TECH and our layout, I have tried to be fairly descriptive and orderly...

The most recent post will be at the TOP. The beginning posts are in the Archive section on the Right, under 2008 and January -only so many posts are able to fit on the page- so, if you're looking for how it all started it will be there.
__________
____________________

Thursday, January 29, 2009

Thursday, January 22, 2009

In Almost a Year...

• 80% of Facilities Planning (FP) has been finished.
-- enough to call "office" for 100% of our full-time Facilities Planners (Bill Daniel, & Will Danielson (No relation)).

• 100% of Computer Services (CS) was moved in [to FP, temporarily] (James Wood-Mgr., Dan Harding, Tim Meadows, & Tim Roden)... and 75% have moved out (all except Jim W.), and into their office space - w/ donated cubicles assembled by 50% of CS (Tim H., & Dan).


(Previously Doug's area & Sound Studio: combined)


• The (not so) Clean Room has been built, converted into a Chapel, and moved into by 50% of Graphic Services (GS) (Doug Shively, & myself - Joel Kreider). Larry Wiklund has moved out of FP into his cubicle (also assembled by 50% of CS). Click to enlarge pics

**This one is wide, so after you click, be sure to scroll to the right**

(Previously the Old Chapel Area, and Clothes Closet: combined)


(Previously the entire CS Dept. and the old UPS Room: combined)


• The slab for the New Addition was formed and poured by David Hastie and crew (the only ones brave enough to try all the curves).




• Sidewalks, and Curbing formed and poured (as I write/type).