Welcome to our Re-construction phase. Keep checking back for updates as we finish up the remodel of our Facilities Planning (Architectural/ Engineering) division... And as we continue with the remodel of the CS (Computer Services), and GS (Graphic Services) areas.

We had a group of guys here that call themselves Steppin' Out Ministries, who took care of the main indoor renovations, and will be intermittently back to help rebuild and tear down as needed/ or funds allow. On the outside, we had High Touch Ministries doing the initial dirt work and grading. This team consists of, well, Darren... and his bionic mechanical, appendage extensions.

Please forgive the lack of "before" shots, hopefully I'll be able to find some later on, and hopefully things will begin to make sense as the days and hours progress.

Note: If you are unfamiliar w/ TECH and our layout, I have tried to be fairly descriptive and orderly...

The most recent post will be at the TOP. The beginning posts are in the Archive section on the Right, under 2008 and January -only so many posts are able to fit on the page- so, if you're looking for how it all started it will be there.
__________
____________________

Monday, March 31, 2008

Weeks 8-11 (Mar. 17- Apr. 4)


Lotsa rain been hapnin' around here... thus the lack of updates.

Here's a smattering...


The Glass for FP Finally Arrived!




And Some Ken Seldon Art...


The New Construction Guard: Overseeing the construction of the new Front Entry Walkway...








5" Drainage pipe installed... which had to be run in between the existing 2" water pipe and Network/ Cable pipe running to the RV Park. This isn't ideal, but could have turned out to be an extreme amount of work... it ended up that it was level, right between the two, and was able to be slipped in between w/o having to elbow the water pipe over the drain.